My advice on preparing 2017's Long-Term Energy Plan is simply this: don't.
I've been asked for thoughts on the new LTEP a couple of times, so I'll present some here primarily for the frequent readers of my work, including some authentic public servants, and hopefully also for a Minister of Energy - although probably not today's.
The primary reason for individuals to avoid the LTEP process is it's been a gimmick - a tool to present Ontario Liberal Party (OLP) policy to the electorate as if it was professionally and independently developed. The connection of professionally developed policy and elections began in 2007. The OLP had come to power in 2003 aided by displeasure over the handling of the electricity file by the previous Progressive Conservative (PC) government. It worked quickly in redesigning the sector to include a professional planning body, the Ontario Power Authority (OPA), which was tasked with producing an Integrated Power System Plan (IPSP):
- The initial IPSP was submitted to the Ontario Energy Board for consideration in August 2007, just in time for the OLP to campaign on the document for the October 2007 election,
- the first LTEP was put out early in 2011 to be the basis for an IPSP, and the OPA did have a draft IPSP on the minister's desk prior to the election in October 2011, although the OLP never did let that draft into public view,
- the next LTEP came out late in 2013, and served as the basis for OLP electioneering on energy in the election that followed in June 2014.
Participating in the development of an LTEP is participation in developing an OLP election platform.
The occupant of the office of the Minister of Energy is currently Glen Thibeault, signalling this LTEP will be as politicized as ever. Last May a report indicated then Minister of Energy Bob Chiarelli, "at loggerheads" with "Environment Minister Glen Murray ...over the possible effect [of carbon costs due to the Climate Action Plan] on electricity prices." At the time Glenn Thibeault was Murray's Parliamentary Assistant, so the introduction of Thibeault as Minister of Energy, in June 2016, was confirmation Chiarelli's concern for electricity pricing had lost the battle. During his first 6 weeks as Minister of Energy Thibeault directed the construction of a $1.4 billion hydro line to service 10,000 distant consumers and refused to recognize electricity pricing as a crisis.
Eight months later, Thibeault sat with the Premier at a press conference due to a crisis. It's unclear if the crisis was electricity pricing or their party's polling numbers, but the actions taken to resolve the crisis don't address the fundamental factors that drove prices higher - so it's probably the polling.
Ontario's next Long-Term Energy Plan is to be produced by a rookie minister three-quarters of the way through his first year in the office, during which he's moved from not seeing a problem with costs to burdening a future generation in order to offer 25% off electricity pricing to 2018's voters.
Ontario's next Long-Term Energy Plan is to be produced by a rookie minister three-quarters of the way through his first year in the office, during which he's moved from not seeing a problem with costs to burdening a future generation in order to offer 25% off electricity pricing to 2018's voters.